Operational Plan for Weather Modification Project: Western Kansas Weather Modification Program, 2014 (2014)

Government Record · Western Kansas Groundwater Management District No. 1 (WKGMD #1) · 2014

Western Kansas Groundwater Management District No. 1 (WKGMD #1), 2014: Filed operational plan for the Western Kansas hail-suppression and rain-augmentation project, specifying the aircraft fleet, seeding devices and operating season, with the aircraft owned by the groundwater district rather than a contractor.

Two single-engine Piper Comanche aircraft will be used for updraft (cloud base) seeding, whereas on-top seeding will be conducted by a twin-engine Piper Cheyenne aircraft. All aircraft are currently owned and maintained by WKGMD #1.

3

Western Kansas Groundwater Management District No. 1 (WKGMD #1), 2014: Filed operational plan for the Western Kansas hail-suppression and rain-augmentation project, specifying the aircraft fleet, seeding devices and operating season, with the aircraft owned by the groundwater district rather than a contractor. Operational plan filed under 15 CFR 908 and held in NOAA's project-report collection. Sponsor/operator: Western Kansas Groundwater Management District No. 1 (WKGMD #1); field headquarters at Kearny County Airport, Lakin KS; season 16 April to 15 September. Aircraft: two single-engine Piper Comanche (cloud base) and one twin-engine Piper Cheyenne (cloud top, dry ice at 2.27 kg/min); Carley-type AgI-acetone wingtip generators plus 12 burn-in-place flares per wing rack. Excerpt is PDF page 3 (section 3.2 'Seeding Aircraft'). Study type: regulatory record.