Weather Modification LLC (WMI) for the North Dakota Department of Water Resources, 2026-10: WMI's 2026 season report to the ND Department of Water Resources: the 66th consecutive NDCMP summer and the second year of a three-year contract, with three Piper Seneca II aircraft operating from Bowman 1 June to 31 August 2026.
This report details the activities of Weather Modification International (WMI) during the 2026 North Dakota Cloud Modification Project (NDCMP) field operations. This was the 66th consecutive summer season of the NDCMP and the second of a three-year contract with WMI and the North Dakota Department of Water Resources (DWR).
Weather Modification LLC (WMI) for the North Dakota Department of Water Resources, 2026-10: WMI's 2026 season report to the ND Department of Water Resources: the 66th consecutive NDCMP summer and the second year of a three-year contract, with three Piper Seneca II aircraft operating from Bowman 1 June to 31 August 2026. C1 Weather Modification Inc. Current-year operator report (October 2026), so the latest status as of 2026-11-22. Records the contract year, the aircraft count and type, the operating base and dates, and the reduced project area after Williams, McKenzie and Mountrail counties did not renew their weather modification authority; it also states that SB 2106 and HB 1514 were defeated. PDF page 1-2 (executive summary). Also filed as GEQ-48 (claims C1, C4). Study type: regulatory record.
