Rainmaker Technology Corp. (sponsor, 2025-09-24: Filed initial report for Pendleton/Umatilla County snowpack enhancement, 1 Oct 2025 to 30 Apr 2026, by Rainmaker Technology Corp., using drones releasing aerosolised dry silver iodide from two launch sites.
The accompanying map depicts two locations ("Southern Site" and "Cabin") where the drones will be launched from, remaining stationary over the site but going up to near cloud base, with a maximum altitude of 15,000 feet AGL.
1
Rainmaker Technology Corp. (sponsor, 2025-09-24: Filed initial report for Pendleton/Umatilla County snowpack enhancement, 1 Oct 2025 to 30 Apr 2026, by Rainmaker Technology Corp., using drones releasing aerosolised dry silver iodide from two launch sites. Record fields: project designation "Pendleton/Umatilla County" (repository title "Blue Mountains Oregon"); 10/01/2025-04/30/2026; purpose "Snowpack enhancement"; sponsor and operator Rainmaker Technology Corp., Holladay UT; two launch locations "Southern Site" and "Cabin"; the Item 6 text repeats the Idaho filing wording for the ADS drone payload (3.5 g/min dry AgI, 105 g total, up to 15,000 ft AGL). Signed 09/24/2025 by Samuel Kim. Study type: regulatory record.
