Michael T. Rietveld et al., 2022-04-22: A peer-reviewed history of the Tromso heating facility records its 1970s construction by the Max Planck Institute for Aeronomy, its transfer to EISCAT in January 1993, and its expected continuation alongside EISCAT_3D.
The facility was transferred to EISCAT in January 1993 and continues to provide new discoveries in plasma physics and ionospheric and atmospheric science to this day. It is expected that Heating will continue operating along with the new generation of IS radar, called EISCAT_3D, when it is commissioned in the near future.
Abstract
Michael T. Rietveld et al., 2022-04-22: A peer-reviewed history of the Tromso heating facility records its 1970s construction by the Max Planck Institute for Aeronomy, its transfer to EISCAT in January 1993, and its expected continuation alongside EISCAT_3D. C1 comparable heater (EISCAT Norway / EISCAT_3D). Peer-reviewed, open access (Copernicus, CC BY). Abstract states construction near Tromso in the 1970s by the Max Planck Institute for Aeronomy and transfer to EISCAT in January 1993. Authors are retired EISCAT/MPS staff writing a facility history – an insider account, disclosed as based on personal memory. text_file=c1-11.txt Retraction/correction status checked 2026-11-22: no retraction, correction or expression of concern attached (Copernicus article page and Crossref record).
