Cloud Seeding Program (Idaho Water Resource Board program page) (2026)

Government Record · Idaho Department of Water Resources / Idaho Water Resource Board · November 22, 2026

Idaho: the IWRB is the state authoriser and funder; Idaho Power Company operates the Collaborative Cloud Seeding Program with local water users paying part of the cost. Page lists 'Current Annual' basin costs of ~$769,000 (Wood River), ~$1,025,000 (Boise) and ~$1,816,000 (Upper Snake) and names High Country RC&D (operated by Let It Snow) and Utah DNR's 3 generators in southern Idaho as separate participants.

The Collaborative Cloud Seeding Program (Collaborative Program) is a partnership between the Idaho Water Resource Board (IWRB), Idaho Power Company (IPC), and local water users. IPC operates the program, while IWRB facilitates and funds it.

Idaho: the IWRB is the state authoriser and funder; Idaho Power Company operates the Collaborative Cloud Seeding Program with local water users paying part of the cost. Page lists 'Current Annual' basin costs of ~$769,000 (Wood River), ~$1,025,000 (Boise) and ~$1,816,000 (Upper Snake) and names High Country RC&D (operated by Let It Snow) and Utah DNR's 3 generators in southern Idaho as separate participants. C3 Idaho program page. Live page, undated: document_date is the access date (access date, page undated). Cost figures are page text beside the map figures, not a table. Study type: regulatory record.