Idaho Power's integrated resource plan as filed with the Idaho Public Utilities Commission, describing cloud seeding (under Idaho Power Today) as adding water that fuels its hydropower system with 32 remote ground generators and two aircraft in the central mountains and a further upper Snake network run with a stakeholder coalition.
The program included 32 remote controlled, ground-based generators and two aircraft for Idaho Power-operated cloud seeding
41
Idaho Power's integrated resource plan as filed with the Idaho Public Utilities Commission, describing cloud seeding (under Idaho Power Today) as adding water that fuels its hydropower system with 32 remote ground generators and two aircraft in the central mountains and a further upper Snake network run with a stakeholder coalition. Public utility commission filing (record of the utility's own plan, not a commission finding on cost). States 2018-19 season used 32 remote generators and 2 aircraft (Payette, Boise, Wood) plus 25 remote and 1 aircraft (upper Snake) and 25 manual generators operated by a stakeholder coalition; estimates 1,269,000 acre-feet of additional runoff at build-out. No dollar cost of seeding in the filing; the plan notes expansion of the program was modeled for the 2023 IRP horizon. Pairs with the IPUC 2023 IRP appendix, which models weather modification as a resource. Study type: regulatory record.