Krishna B. Khatri et al., 2019-05: Utah: the go/no-go-stop authority is specified , the DNR Executive Director or designee sets where and how snow water equivalent is measured (SNOTEL sites) and operations must be suspended when SWE exceeds 175%/175%/160%/150%/140% of average on 1 Dec/1 Jan/1 Feb/1 Mar/1 Apr, or on avalanche hazard; the project meteorologist suspends on NWS warnings.
The Executive Director of the Department of Natural Resources or his or her designee will determine where and how SWE’s are to be measured, including at selected SNOTEL sites
12
Krishna B. Khatri et al., 2019-05: Utah: the go/no-go-stop authority is specified , the DNR Executive Director or designee sets where and how snow water equivalent is measured (SNOTEL sites) and operations must be suspended when SWE exceeds 175%/175%/160%/150%/140% of average on 1 Dec/1 Jan/1 Feb/1 Mar/1 Apr, or on avalanche hazard; the project meteorologist suspends on NWS warnings. C3 Utah suspension criteria. Excerpt page 12; threshold and meteorologist-suspension text from the same section (pp.12-13). Study type: regulatory record.
