Southern Cross University, 2020-04-17: University announcement of the first outdoor marine cloud brightening trial on the Great Barrier Reef, run in 2020 (announced 17 April 2020) from a barge near Broadhurst Reef about 100 km off Townsville, Queensland. It reports a prototype turbine with high-pressure nozzles producing hundreds of trillions of sea-salt crystals per second, verified with a drone in the atmosphere and a sampling vessel 5 km away, at one-tenth of the intended scale. It names the project lead as Daniel Harrison of Southern Cross University, the partner institutions (SIMS, University of Sydney, QUT, EmiControls), funding through the Queensland and Australian Governments' Boosting Coral Abundance Challenge, and states future trials would be funded through the Federal Government's $150m RRAP research and development phase.
Days before virus restrictions were imposed, a research team led by the Sydney Institute of Marine Science and Southern Cross University successfully trialled world-first 'cloud brightening' technology off the Townsville coast
Southern Cross University, 2020-04-17: University announcement of the first outdoor marine cloud brightening trial on the Great Barrier Reef, run in 2020 (announced 17 April 2020) from a barge near Broadhurst Reef about 100 km off Townsville, Queensland. It reports a prototype turbine with high-pressure nozzles producing hundreds of trillions of sea-salt crystals per second, verified with a drone in the atmosphere and a sampling vessel 5 km away, at one-tenth of the intended scale. It names the project lead as Daniel Harrison of Southern Cross University, the partner institutions (SIMS, University of Sydney, QUT, EmiControls), funding through the Queensland and Australian Governments' Boosting Coral Abundance Challenge, and states future trials would be funded through the Federal Government's $150m RRAP research and development phase. Not a study – university media release announcing a field trial (published 17 April 2020; read 2026-11-22). Country: Australia, Broadhurst Reef off Townsville, Queensland, late March 2020, under a permit from the Great Barrier Reef Marine Park Authority. Method as described: prototype spray turbine on an ocean barge, drone sampling aloft and a vessel 5 km downwind; no control or blank, and the release states the trial was not designed to test whether clouds were brightened, only that the delivery system worked. Funder: Queensland and Australian Governments' Boosting Coral Abundance Challenge; future work through the Australian Government's $150m RRAP. Conflicts: none declared; issuer is the research institution promoting its own programme. Route: plain HTML fetched with curl, tag-stripped to text. Also filed as GEE-31 (claims C5, C7). Study type: news.
