Cloud Seeding (2025)

Other · Snowy Hydro Limited · 2025

Snowy Hydro Limited, 2025: Operator page for Australia's largest cloud-seeding program. Confirms a glaciogenic silver-iodide seeding program over the Snowy Mountains, begun as a legislated trial in 2004 under the Snowy Mountains Cloud Seeding Trial Act 2004 (NSW), converted to an operational program in 2013 under the amended Act, targeting about 2,110 km2 of the Snowy water catchment with up to 23 ground-based generators, May-October, only when precipitation is forecast to fall as snow to at least 1,400 m. States an independent evaluation found an average 14% precipitation increase with no adverse downwind rainfall effects. The same page carries a '2025 CLOUD SEEDING UPDATE' announcing that Snowy Hydro is permanently ceasing the program, so the claim's present tense is out of date: seeding ran between May and October until 2023 and the program was permanently ceased in 2025.

In 2004, Snowy Hydro began a cloud seeding program to enhance snowfall over the Snowy Mountains during suitable conditions in the cold months.

Snowy Hydro Limited, 2025: Operator page for Australia's largest cloud-seeding program. Confirms a glaciogenic silver-iodide seeding program over the Snowy Mountains, begun as a legislated trial in 2004 under the Snowy Mountains Cloud Seeding Trial Act 2004 (NSW), converted to an operational program in 2013 under the amended Act, targeting about 2,110 km2 of the Snowy water catchment with up to 23 ground-based generators, May-October, only when precipitation is forecast to fall as snow to at least 1,400 m. States an independent evaluation found an average 14% precipitation increase with no adverse downwind rainfall effects. The same page carries a '2025 CLOUD SEEDING UPDATE' announcing that Snowy Hydro is permanently ceasing the program, so the claim's present tense is out of date: seeding ran between May and October until 2023 and the program was permanently ceased in 2025. Not a study – operator's own public information page (page undated; carries a '2025 CLOUD SEEDING UPDATE' block; read 2026-11-22). Stated operator: Snowy Hydro Limited, a Commonwealth-owned hydro-electric company; it is describing its own activity, so self-reported. No sample size or controls; figures (2,110 km2 target, 23 generators, 14% average increase) are the operator's summary of the NSW Natural Resources Commission review and peer-reviewed evaluations, not new measurements. Funder of the seeding program: Snowy Hydro. No declared conflicts on the page. Route: plain HTML fetched with curl, tag-stripped to text. Study type: other.